Gallery.
Photos and videos from the installation and commissioning of lines at our customers' plants.
Photos
Click a photo to enlarge it and use the arrows to browse.
Oven separators, McWane Ductile
Ohio (USA), 2026
Rafter production lines and KraftWerks exit handling system
Lindsay, Nebraska (USA), 2025–2026
Rafter production lines
Greenfield, California (USA), 2025–2026
Two Rafter production lines
Haydon, Ohio (USA), 2024–2025
KraftWerks packaging system
South Carolina (USA), 2024
VSB Vallourec hydrotesters
Jeceaba and Belo Horizonte (Brazil), 2023–2024
Novacero bundler and slitter
Guayaquil (Ecuador), 2023
ETF inductors, Fives Celes
Lipetsk and Yekaterinburg (Russia), 2020–2021
Aceros Arequipa slitter
Peru, 2019
Hydrotesters and pipe finishing line
OMK Vyksa (Russia), 2018–2019
CGL galvanizing line, Fives ST
Fangchenggang (China), 2016
Hydrotesters and straighteners, Gazprom
Volgorechensk (Russia), 2014–2015
Videos
Short clips from trial runs of the lines.
Rafter production lines and KraftWerks exit handling system
Lindsay, Nebraska (USA), 2026
Forming a tube bundle
Gantry manipulator above tube conveyors
Tube conveyor towards the plant exit
Exit handling station
Transferring tubes with the gantry manipulator
Spiral strip accumulator of the production line
Manipulator above a tube conveyor
Gantry manipulator – view along the line
VSB Vallourec hydrotester revamp
Jeceaba (Brazil), 2023
Pipes in the hydrotester line
Pipes passing through the line
Hydrotester detail
Aceros Arequipa slitter
Peru, 2019
Longitudinal strip slitting
Strip shearing
Recoiled coils after slitting
Hydrotesters and pipe finishing line
OMK Vyksa (Russia), 2019
Hydrotester line in operation
Equipment trial run – top view
Equipment trial run – view along the line
Abbey reducing mill, Cooper Standard
Kunshan (China), 2017–2018
HMI screens and the line during commissioning
Tube cutting with a saw
Profile production line
Elektrostal (Russia), 2016
Profile production line in operation